Media Releases

L3 MAPPS TO UPGRADE THE FERMI 2 NUCLEAR POWER PLANT SIMULATOR

MONTREAL, March 6, 2012 – L3 MAPPS announced today that it is has been contracted by DTE Energy to upgrade the Fermi 2 Nuclear Power Plant simulator with L-3's Orchid® simulation environment. The company will also provide DTE Energy with an additional simulator specifically to train field personnel on Emergency Diesel Generator (EDG) operations. The project starts immediately and is slated for completion in the summer of 2012.

"L-3 has a strong track record of performing work on the Fermi 2 simulator," said Michael Chatlani, vice president of L3 MAPPS Power Systems and Simulation. "We are pleased to have this follow-on opportunity to advance the Fermi simulator using today's state-of-the-art technology."

In September 2006, L3 MAPPS successfully performed a comprehensive refurbishment of the Fermi 2 simulator's computers, instructor stations and simulation models to improve the simulator's training effectiveness and long-term performance, while reducing operating costs.

For the current project, L3 MAPPS will continue to advance the efficiency of the Fermi 2 simulator by updating all of the simulation computers to the latest generation, as well as migrating the models and simulator maintenance tools from the previous generation of L-3 software to its user-friendly, industry-leading Orchid simulation environment. In addition, an EDG simulator will be deployed, with virtual panels based on L-3's Orchid Touch Interface solution.

DTE Energy Co. (NYSE: DTE) is a diversified energy company involved in the development and management of energy-related businesses and services nationwide. Located in Monroe County, Mich., the Fermi 2 plant is a 1,122-megawatt General Electric BWR power plant that produces about 15 percent of the power generated by Detroit Edison power plants. This single plant is capable of producing enough electricity to serve a city of about one million people.

L3 MAPPS, a division of L-3 Marine & Power Systems, has nearly 30 years of experience in pioneering technological advances in the marine automation field and nearly 40 years of experience in delivering high-fidelity power plant simulation to leading utilities worldwide. In addition, the company has more than four decades of expertise in supplying plant computer systems for Canadian heavy water reactors. L-3 MAPPS also provides targeted controls and simulation solutions to the space sector. To learn more about L3 MAPPS, please visit the company's website at www.L3T.com/MAPPS.

Comprising 25 operating companies, L-3 Marine & Power Systems (L-3 M&PS) is a worldwide leader in maritime automation and control, navigation, communications, dynamic positioning, and power distribution and conditioning for the U.S. Navy, allied foreign navies and commercial customers worldwide. L-3 M&PS also produces full-fidelity simulators for increased operator proficiency, resulting in safe operations for leading international utilities and ship operators. With over 85 locations in 19 countries, L-3 M&PS is a cohesive, global partner with extensive capabilities and a proven track record in delivering the highest level of technology, service and integration. To learn more about L-3 Marine & Power Systems, please visit the company’s website at www.L-3com.com/MPS.

Headquartered in New York City, L-3 employs approximately 51,000 people worldwide and is a prime contractor in C3ISR (Command, Control, Communications, Intelligence, Surveillance and Reconnaissance) systems, platform and logistics solutions, and national security solutions. L-3 is also a leading provider of a broad range of electronic systems used on military and commercial platforms. The company reported 2012 sales of $13.1 billion. To learn more about L-3, please visit the company’s website at www.L3T.com.


Safe Harbor Statement Under the Private Securities Litigation Reform Act of 1995

Except for historical information contained herein, the matters set forth in this news release are forward-looking statements. Statements that are predictive in nature, that depend upon or refer to events or conditions or that include words such as “expects,” “anticipates,” “intends,” “plans,” “believes,” “estimates,” “will,” “could” and similar expressions are forward-looking statements. The forward-looking statements set forth above involve a number of risks and uncertainties that could cause actual results to differ materially from any such statement, including the risks and uncertainties discussed in the company’s Safe Harbor Compliance Statement for Forward-Looking Statements included in the company’s recent filings, including Forms 10-K and 10-Q, with the Securities and Exchange Commission. The forward-looking statements speak only as of the date made, and the company undertakes no obligation to update these forward-looking statements.

Fermi 2 nuclear plant simulator
Fermi 2 nuclear plant simulator

MEDIA CONTACT

  • Sean Bradley
  • Senior Specialist
    Sales & Operations Services
  • +1 514-787-4953
  • media.mapps@L3T.com

MARINE SYSTEMS AND SIMULATION

Naval vessel control systems, land-based and on-board simulators and turnkey training solutions.

POWER SYSTEMS AND SIMULATION

Real-time power plant simulators and simulator modernization for all plant types and CANDU plant computer systems.

SPACE SYSTEMS AND SIMULATION

Real-time simulators for robotic systems and satellites to support simulation-based design and operations / maintenance training.